Formwork Design

Subject: Building Construction 2
Semester: 3
Title: Formwork model
Group members:
Darren
Sherm
Liqun
Waisie
Hauyee
Daph



1st steps: foundation preparation(with nails)
thats stump after taking off their formwork
2nd steps: ground beam formwork +collar cliq
with reinforcements and spacers using hammer to hold and maintain the height of the formwork
3rd steps: pouring cements
4th steps: wait for it to be harden

owkay, lets have a tiny break 1st...mmmm mmmm....yummy~
*flashing light*

zooooommm~~~~
back to work!
ground beam COMPLETED!
5th steps: floor slabs formwork!
:)
small little spacer~ cute!
floor slabs with reinforcement and spacers

6th steps: stairs formwork while waiting for cement to be harden.
smoothest cement mixture :)
after harden, that is the detailing on the collumn's reinforcement
owh thats the reflection of a finger! :)
hey wats ANDY doing here?!
o.O""
7th steps: spacers sticking around the reinforcement so that the steel wire would not touch the side in the formwork
wow nice collumn formwork effect~
sherm : "light at the end of tunnel"
8th steps:collumn formwork
pouring cements
lurvely "accident" from waisie~
cool yea~ it looks like an EYE!haha

mirror effect XD

then continue by 1st and 2nd floor beam, slabs, columns n other formworks...

And that is how it look like at the end <3>

exo view

back elevetion

front elevation

and side elevetion ^^


This is the most time consuming, assignment I ever had which takes around 3 weeks to complete it. It does need certain skills and technique to make it work, and YES,WE DID IT! :)